§ 803. Conditions of license generallyAll licenses issued under this subchapter shall be on the following conditions:
(a) Modification of plans; factors considered to secure adaptability of project; recommendations for proposed terms and conditions
(1) That the project adopted, including the maps, plans, and specifications, shall be such as in the judgment of the Commission will be best adapted to a comprehensive plan for improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, for the improvement and utilization of water-power development, for the adequate protection, mitigation, and enhancement of fish and wildlife (including related spawning grounds and habitat), and for other beneficial public uses, including irrigation, flood control, water supply, and recreational and other purposes referred to in section 797(e) of this title 1
1 So in original. Probably should be followed by “; and”.
if necessary in order to secure such plan the Commission shall have authority to require the modification of any project and of the plans and specifications of the project works before approval.
(2) In order to ensure that the project adopted will be best adapted to the comprehensive plan described in paragraph (1), the Commission shall consider each of the following:
(A) The extent to which the project is consistent with a comprehensive plan (where one exists) for improving, developing, or conserving a waterway or waterways affected by the project that is prepared by—
(i) an agency established pursuant to Federal law that has the authority to prepare such a plan; or
(ii) the State in which the facility is or will be located.
(B) The recommendations of Federal and State agencies exercising administration over flood control, navigation, irrigation, recreation, cultural and other relevant resources of the State in which the project is located, and the recommendations (including fish and wildlife recommendations) of Indian tribes affected by the project.
(C) In the case of a State or municipal applicant, or an applicant which is primarily engaged in the generation or sale of electric power (other than electric power solely from cogeneration facilities or small power production facilities), the electricity consumption efficiency improvement program of the applicant, including its plans, performance and capabilities for encouraging or assisting its customers to conserve electricity cost-effectively, taking into account the published policies, restrictions, and requirements of relevant State regulatory authorities applicable to such applicant.
(3) Upon receipt of an application for a license, the Commission shall solicit recommendations from the agencies and Indian tribes identified in subparagraphs (A) and (B) of paragraph (2) for proposed terms and conditions for the Commission’s consideration for inclusion in the license.
(b) Alterations in project works
(c) Maintenance and repair of project works; liability of licensee for damages
(d) Amortization reserves
(e) Annual charges payable by licensees; maximum rates; application; review and report to Congress
(1) That the licensee shall pay to the United States reasonable annual charges in an amount to be fixed by the Commission for the purpose of reimbursing the United States for the costs of the administration of this subchapter, including any reasonable and necessary costs incurred by Federal and State fish and wildlife agencies and other natural and cultural resource agencies in connection with studies or other reviews carried out by such agencies for purposes of administering their responsibilities under this subchapter; for recompensing it for the use, occupancy, and enjoyment of its lands or other property; and for the expropriation to the Government of excessive profits until the respective States shall make provision for preventing excessive profits or for the expropriation thereof to themselves, or until the period of amortization as herein provided is reached, and in fixing such charges the Commission shall seek to avoid increasing the price to the consumers of power by such charges, and any such charges may be adjusted from time to time by the Commission as conditions may require: Provided, That, subject to annual appropriations Acts, the portion of such annual charges imposed by the Commission under this subsection to cover the reasonable and necessary costs of such agencies shall be available to such agencies (in addition to other funds appropriated for such purposes) solely for carrying out such studies and reviews and shall remain available until expended: Provided, That when licenses are issued involving the use of Government dams or other structures owned by the United States or tribal lands embraced within Indian reservations the Commission shall, subject to the approval of the Secretary of the Interior in the case of such dams or structures in reclamation projects and, in the case of such tribal lands, subject to the approval of the Indian tribe having jurisdiction of such lands as provided in section 5123 of title 25, fix a reasonable annual charge for the use thereof, and such charges may with like approval be readjusted by the Commission at the end of twenty years after the project is available for service and at periods of not less than ten years thereafter upon notice and opportunity for hearing: Provided further, That licenses for the development, transmission, or distribution of power by States or municipalities shall be issued and enjoyed without charge to the extent such power is sold to the public without profit or is used by such State or municipality for State or municipal purposes, except that as to projects constructed or to be constructed by States or municipalities primarily designed to provide or improve navigation, licenses therefor shall be issued without charge; and that licenses for the development, transmission, or distribution of power for domestic, mining, or other beneficial use in projects of not more than two thousand horsepower installed capacity may be issued without charge, except on tribal lands within Indian reservations; but in no case shall a license be issued free of charge for the development and utilization of power created by any Government dam and that the amount charged therefor in any license shall be such as determined by the Commission: Provided however, That no charge shall be assessed for the use of any Government dam or structure by any licensee if, before January 1, 1985, the Secretary of the Interior has entered into a contract with such licensee that meets each of the following requirements:
(A) The contract covers one or more projects for which a license was issued by the Commission before January 1, 1985.
(B) The contract contains provisions specifically providing each of the following:
(i) A powerplant may be built by the licensee utilizing irrigation facilities constructed by the United States.
(ii) The powerplant shall remain in the exclusive control, possession, and ownership of the licensee concerned.
(iii) All revenue from the powerplant and from the use, sale, or disposal of electric energy from the powerplant shall be, and remain, the property of such licensee.
(C) The contract is an amendatory, supplemental and replacement contract between the United States and: (i) the Quincy-Columbia Basin Irrigation District (Contract No. 14–06–100–6418); (ii) the East Columbia Basin Irrigation District (Contract No. 14–06–100–6419); or, (iii) the South Columbia Basin Irrigation District (Contract No. 14–06–100–6420).
This paragraph shall apply to any project covered by a contract referred to in this paragraph only during the term of such contract unless otherwise provided by subsequent Act of Congress. In the event an overpayment of any charge due under this section shall be made by a licensee, the Commission is authorized to allow a credit for such overpayment when charges are due for any subsequent period.
(2) In the case of licenses involving the use of Government dams or other structures owned by the United States, the charges fixed (or readjusted) by the Commission under paragraph (1) for the use of such dams or structures shall not exceed 1 mill per kilowatt-hour for the first 40 gigawatt-hours of energy a project produces in any year, 1½ mills per kilowatt-hour for over 40 up to and including 80 gigawatt-hours in any year, and 2 mills per kilowatt-hour for any energy the project produces over 80 gigawatt-hours in any year. Except as provided in subsection (f), such charge shall be the only charge assessed by any agency of the United States for the use of such dams or structures.
(3) The provisions of paragraph (2) shall apply with respect to—
(A) all licenses issued after October 16, 1986; and
(B) all licenses issued before October 16, 1986, which—
(i) did not fix a specific charge for the use of the Government dam or structure involved; and
(ii) did not specify that no charge would be fixed for the use of such dam or structure.
(4) Every 5 years, the Commission shall review the appropriateness of the annual charge limitations provided for in this subsection and report to Congress concerning its recommendations thereon.
(f) Reimbursement by licensee of other licensees, etc.
(g) Conditions in discretion of commission
(h) Monopolistic combinations; prevention or minimization of anticompetitive conduct; action by Commission regarding license and operation and maintenance of project
(1) Combinations, agreements, arrangements, or understandings, express or implied, to limit the output of electrical energy, to restrain trade, or to fix, maintain, or increase prices for electrical energy or service are hereby prohibited.
(2) That conduct under the license that: (A) results in the contravention of the policies expressed in the antitrust laws; and (B) is not otherwise justified by the public interest considering regulatory policies expressed in other applicable law (including but not limited to those contained in subchapter II of this chapter) shall be prevented or adequately minimized by means of conditions included in the license prior to its issuance. In the event it is impossible to prevent or adequately minimize the contravention, the Commission shall refuse to issue any license to the applicant for the project and, in the case of an existing project, shall take appropriate action to provide thereafter for the operation and maintenance of the affected project and for the issuing of a new license in accordance with section 808 of this title.
(i) Waiver of conditions
(j) Fish and wildlife protection, mitigation and enhancement; consideration of recommendations; findings
(1) That in order to adequately and equitably protect, mitigate damages to, and enhance, fish and wildlife (including related spawning grounds and habitat) affected by the development, operation, and management of the project, each license issued under this subchapter shall include conditions for such protection, mitigation, and enhancement. Subject to paragraph (2), such conditions shall be based on recommendations received pursuant to the Fish and Wildlife Coordination Act (16 U.S.C. 661 et seq.) from the National Marine Fisheries Service, the United States Fish and Wildlife Service, and State fish and wildlife agencies.
(2) Whenever the Commission believes that any recommendation referred to in paragraph (1) may be inconsistent with the purposes and requirements of this subchapter or other applicable law, the Commission and the agencies referred to in paragraph (1) shall attempt to resolve any such inconsistency, giving due weight to the recommendations, expertise, and statutory responsibilities of such agencies. If, after such attempt, the Commission does not adopt in whole or in part a recommendation of any such agency, the Commission shall publish each of the following findings (together with a statement of the basis for each of the findings):
(A) A finding that adoption of such recommendation is inconsistent with the purposes and requirements of this subchapter or with other applicable provisions of law.
(B) A finding that the conditions selected by the Commission comply with the requirements of paragraph (1).
Subsection (i) shall not apply to the conditions required under this subsection.
(June 10, 1920, ch. 285, pt. I, § 10, 41 Stat. 1068; renumbered pt. I and amended, Aug. 26, 1935, ch. 687, title II, §§ 206, 212, 49 Stat. 842, 847; Pub. L. 87–647, Sept. 7, 1962, 76 Stat. 447; Pub. L. 90–451, § 4, Aug. 3, 1968, 82 Stat. 617; Pub. L. 99–495, §§ 3(b), (c), 9(a), 13, Oct. 16, 1986, 100 Stat. 1243, 1244, 1252, 1257; Pub. L. 99–546, title IV, § 401, Oct. 27, 1986, 100 Stat. 3056; Pub. L. 102–486, title XVII, § 1701(a), Oct. 24, 1992, 106 Stat. 3008.)