§ 250.743 - What are the well activity reporting requirements?
(a) For operations in the BSEE Gulf of Mexico (GOM) OCS Region, you must submit Form BSEE-0133, Well Activity Report (WAR), to the District Manager on a weekly basis. The reporting week is defined as beginning on Sunday (12 a.m.) and ending on the following Saturday (11:59 p.m.). This reporting week corresponds to a week (Sunday through Saturday) on a standard calendar. Report any well operations that extend past the end of this weekly reporting period on the next weekly report. The reporting period for the weekly report is never longer than 7 days, but could be less than 7 days for the first reporting period and the last reporting period for a particular well operation. Submit each WAR and accompanying Form BSEE-0133S, Open Hole Data Report, to the BSEE GOM OCS Region no later than close of business on the Friday immediately after the closure of the reporting week. The District Manager may require more frequent submittal of the WAR on a case-by-case basis.
(b) For operations in the Pacific or Alaska OCS Regions, you must submit Form BSEE-0133, WAR, to the District Manager on a daily basis.
(c) The WAR must include a description of the operations conducted, any abnormal or significant events that affect the permitted operation each day within the report from the time you begin operations to the time you end operations, any verbal approval received, the well's as-built drawings, casing, fluid weights, shoe tests, test pressures at surface conditions, and any other information concerning well activities required by the District Manager. For casing cementing operations, indicate type of returns (i.e., full, partial, or none). If partial or no returns are observed, you must indicate how you determined the top of cement. For each report, indicate the operation status for the well at the end of the reporting period. On the final WAR, indicate the status of the well (completed, temporarily abandoned, permanently abandoned, or drilling suspended) and the date you finished such operations.