Collapse to view only § 1970.5 - Responsible parties.

§ 1970.1 - Purpose, applicability, and scope.

(a) Purpose. The purpose of this part is to ensure that the Agency complies with the National Environmental Policy Act of 1969, as amended (NEPA) (42 U.S.C. 4321, et seq.), and other applicable environmental requirements in order to make better decisions based on an understanding of the environmental consequences of proposed actions, and take actions that protect, restore, and enhance the quality of the human environment.

(b) Applicability. The environmental policies and procedures contained in this part are applicable to programs administered by the Rural Business-Cooperative Service (RBS), Rural Housing Service (RHS), and Rural Utilities Service (RUS); herein referred to as “the Agency.”

(c) Scope. This part integrates NEPA with other planning, environmental review processes, and consultation procedures required by other Federal laws, regulations, and Executive Orders applicable to Agency programs. This part also supplements the Council on Environmental Quality (CEQ) regulations implementing the procedural provisions of NEPA, 40 CFR parts 1500 through 1508. To the extent appropriate, the Agency will take into account CEQ guidance and memoranda. This part also incorporates and complies with the procedures of Section 106 (36 CFR part 800) of the National Historic Preservation Act (NHPA) and Section 7 (50 CFR part 402) of the Endangered Species Act (ESA).

§ 1970.2 - [Reserved]

§ 1970.3 - Authority.

This part derives its authority from a number of statutes, Executive Orders, and regulations, including but not limited to those listed in this section. Both the Agency and the applicant, as appropriate, must comply with these statutes, Executive Orders, and regulations, as well as any future statutes, Executive Orders, and regulations that affect the Agency's implementation of this part.

(a) National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.);

(b) Council on Environmental Quality Regulations Implementing the Procedural Provisions of the National Environmental Policy Act (40 CFR parts 1500 through 1508);

(c) U. S. Department of Agriculture, NEPA Policies and Procedures (7 CFR part 1b).

(d) Department of Agriculture, Enhancement, Protection and Management of the Cultural Environment (7 CFR parts 3100 through 3199);

(e) Archaeological and Historic Preservation Act of 1960, as amended, (16 U.S.C. 469 et seq.);

(f) Archaeological Resources Protection Act of 1979 (16 U.S.C. 470aa et seq.);

(g) Bald and Golden Eagle Protection Act (16 U.S.C. 668 et seq.);

(h) Clean Air Act (42 U.S.C. 7401 et seq.);

(i) Clean Water Act (Federal Water Pollution Control Act, 33 U.S.C. 1251 et seq.);

(j) Coastal Barrier Resources Act (16 U.S.C. 3501 et seq.);

(k) Coastal Barrier Improvement Act (42 U.S.C. 4028 et seq.);

(l) Coastal Zone Management Act (16 U.S.C. 1456);

(m) Comprehensive Environmental Response, Compensation, and Liability Act (42 U.S.C. 103) (CERCLA);

(n) Consolidated Farm and Rural Development Act, Sections 307(a)(6)(A) (7 U.S.C. 1927(a)(6)(A)) and 363 (7 U.S.C. 2006e);

(o) Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.);

(p) Farmland Protection Policy Act (7 U.S.C. 4201 et seq.);

(q) Historic Sites, Buildings and Antiquities Act (16 U.S.C. 461 et seq.);

(r) Housing and Community Development Act of 1992 (42 U.S.C. 542(c)(9));

(s) Migratory Bird Treaty Act (16 U.S.C. 703-711);

(t) National Historic Preservation Act (16 U.S.C. 470 et seq.);

(u) National Trails System Act (16 U.S.C. 1241 et seq.);

(v) Native American Graves Protection and Repatriation Act (25 U.S.C. 3001 et seq.);

(w) Noise Control Act (42 U.S.C. 4901 et seq.);

(x) Pollution Prevention Act of 1990 (42 U.S.C. 13101 et seq.);

(y) Resource Conservation and Recovery Act (42 U.S.C. 6901);

(z) Safe Drinking Water Act—(42 U.S.C. 300f et seq.);

(aa) Wild and Scenic Rivers Act (16 U.S.C. 1271 et seq.);

(bb) Wilderness Act (16 U.S.C. 1131 et seq.);

(cc) Compact of Free Association between the United States and the Republic of the Marshall Islands and between the United States and the Federated States of Micronesia (Public Law 108-188);

(dd) Compact of Free Association between the United States and the Republic of Palau (Public Law 99-658);

(ee) Executive Order 11514, Protection and Enhancement of Environmental Quality;

(ff) Executive Order 11593, Protection and Enhancement of the Cultural Environment;

(gg) Executive Order 11988, Floodplain Management;

(hh) Executive Order 11990, Protection of Wetlands;

(ii) Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low Income Populations;

(jj) Executive Order 12372, Intergovernmental Review;

(kk) Executive Order 13112, Invasive Species;

(ll) Executive Order 13175, Consultation and Coordination with Indian Tribal Governments;

(mm) Executive Order 13287, Preserve America;

(nn) Executive Order 13016, Federal Support of Community Efforts along American Heritage Rivers;

(oo) Executive Order 13352, Facilitation of Cooperative Conservation;

(pp) Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management;

(qq) Executive Order 13653, Preparing the United States for the Impacts of Climate Change;

(rr) Executive Order 13690, Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input;

(ss) Executive Order 13693, Planning for Federal Sustainability in the Next Decade;

(tt) Agriculture Departmental Regulation (DR) 5600-2, Environmental Justice;

(uu) Agriculture Departmental Regulation (DR) 9500-3, Land Use Policy;

(vv) Agriculture Departmental Regulation (DR) 9500-4, Fish and Wildlife Policy;

(ww) Agriculture Departmental Regulation (DR) 1070-001, U.S. Department of Agriculture (USDA) Policy Statement on Climate Change Adaptation; and

(xx) Agriculture Departmental Manual (DM) 5600-001, Environmental Pollution Prevention, Control, and Abatement Manual.

§ 1970.4 - Policies.

(a) Applicants' proposals must, whenever practicable, avoid or minimize adverse environmental impacts; avoid or minimize conversion of wetlands or important farmlands (as defined in the Farmland Protection Policy Act and its implementing regulations issued by the USDA Natural Resources Conservation Service) when practicable alternatives exist to meet development needs; avoid unwarranted alterations or encroachment on floodplains when practicable alternatives exist to meet developmental needs; and avoid or minimize potentially disproportionate and adverse impacts to minority or low-income populations within the proposed action's area of impact. Avoiding development in floodplains includes avoiding development in the 500-year floodplain, as shown on the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps, where the proposed actions and facilities are defined as critical actions in § 1970.6. The Agency shall not fund the proposal unless there is a demonstrated, significant need for the proposal and no practicable alternative exists to the proposed conversion of the above resources.

(b) The Agency encourages the reuse of real property defined as brownfields per Section 101 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) where the reuse of such property is complicated by the presence or potential presence of a hazardous substance, pollutant, or other contaminant, provided that the level of such presence does not threaten human health and the environment for the proposed land use. The Agency will defer to the agency with regulatory authority under the appropriate law in determining the appropriate level of contaminant for a specific proposed land use. The Agency will evaluate the risk based upon the applicable regulatory agency's review and concurrence with the proposal.

(c) The Agency and applicant will involve other Federal agencies with jurisdiction by law or special expertise, state and local governments, Indian tribes and Alaska Native organizations, Native Hawaiian organizations, and the public, early in the Agency's environmental review process to the fullest extent practicable. To accomplish this objective, the Agency and applicant will:

(1) Ensure that environmental amenities and values be given appropriate consideration in decision making along with economic and technical considerations;

(2) At the earliest possible time, advise interested parties of the Agency's environmental policies and procedures and required environmental impact analyses during early project planning and design; and

(3) Make environmental assessments (EA) and environmental impact statements (EIS) available to the public for review and comment in a timely manner.

(d) The Agency and applicant will ensure the completion of the environmental review process prior to the irreversible and irretrievable commitment of Agency resources in accordance with § 1970.11. The environmental review process is concluded when the Agency approves the applicability of a Categorical Exclusion (CE), issues a Finding of No Significant Impact (FONSI), or issues a Record of Decision (ROD).

(e) If an applicant's proposal does not comply with Agency environmental policies and procedures, the Agency will defer further consideration of the application until compliance can be demonstrated, or the application may be rejected. Any applicant that is directly and adversely affected by an administrative decision made by the Agency under this part may appeal that decision, to the extent permissible under 7 CFR part 11.

(f) The Agency recognizes the worldwide and long-range character of environmental problems and, where consistent with the foreign policy of the United States, will lend appropriate support to initiatives, resolutions, and programs designed to maximize international cooperation in anticipating and preventing a decline in the quality of humankind's world environment in accordance with NEPA, 42 U.S.C. 4321 et seq.

(g) The Agency will use the NEPA process, to the maximum extent feasible, to identify and encourage opportunities to reduce greenhouse gas (GHG) emissions caused by proposed Federal actions that would otherwise result in the emission of substantial quantities of GHG.

§ 1970.5 - Responsible parties.

(a) Agency. The following paragraphs identify the general responsibilities of the Agency.

(1) The Agency is responsible for all environmental decisions and findings related to its actions and will encourage applicants to design proposals to protect, restore, and enhance the environment.

(2) If the Agency requires an applicant to submit environmental information, the Agency will outline the types of information and analyses required in guidance documents. This guidance is available on the Agency's Web site. The Agency will independently evaluate the information submitted.

(3) The Agency will advise applicants and applicable lenders of their responsibilities to consider environmental issues during early project planning and that specific actions listed in § 1970.12, such as initiation of construction, cannot occur prior to completion of the environmental review process or it could result in a denial of financial assistance.

(4) The Agency may act as either a lead agency or a cooperating agency in the preparation of an environmental review document. If the Agency acts as a cooperating agency, the Agency will fulfill the cooperating agency responsibilities outlined in 40 CFR 1501.6.

(5) Mitigation measures described in the environmental review and decision documents must be included as conditions in Agency financial commitment documents, such as a conditional commitment letter.

(6) The Agency, guaranteed lender, or multi-tier recipients will monitor and track the implementation, maintenance, and effectiveness of any required mitigation measures.

(b) Applicants. Applicants must comply with provisions found in paragraphs (b)(1) through (8) of this section.

(1) Consult with Agency staff to determine the appropriate level of environmental review and to obtain publicly available resources at the earliest possible time for guidance in identifying all relevant environmental issues that must be addressed and considered during early project planning and design throughout the process.

(2) Where appropriate, contact state and Federal agencies to initiate consultation on matters affected by this part. This part authorizes applicants to coordinate with state and Federal agencies on behalf of the Agency. However, applicants are not authorized to initiate consultation in accordance with Section 106 of the National Historic Preservation Act with Indian tribes on behalf of the Agency. In those cases, applicants need the express written authority of the Agency and consent of Indian tribes in order to initiate consultation.

(3) Provide information to the Agency that the Agency deems necessary to evaluate the proposal's potential environmental impacts and alternatives.

(i) Applicants must ensure that all required materials are current, sufficiently detailed and complete, and are submitted directly to the Agency office processing the application. Incomplete materials or delayed submittals may jeopardize consideration of the applicant's proposal by the Agency and may result in no award of financial assistance.

(ii) Applicants must clearly define the purpose and need for the proposal and inform the Agency promptly if any other Federal, state, or local agencies are involved in financing, permitting, or approving the proposal, so that the Agency may coordinate and consider participation in joint environmental reviews.

(iii) As necessary, applicants must develop and document reasonable alternatives that meet their purpose and need while improving environmental outcomes.

(iv) Applicants must prepare environmental review documents according to the format and standards provided by the Agency. The Agency will independently evaluate the final documents submitted. All environmental review documents must be objective, complete, and accurate in order for them to be finally accepted by the Agency. Applicants may employ a design or environmental professional or technical service provider to assist them in the preparation of their environmental review documents.

(A) Applicants are not generally required to prepare environmental documentation for proposals that involve Agency activities with no or minimal disturbance listed in § 1970.53. However, the Agency may request additional environmental documentation from the applicant at any time, specifically if the Agency determines that extraordinary circumstances may exist.

(B) For CEs listed in § 1970.54, applicants must prepare environmental documentation as required by the Agency; the environmental documentation required for CEs is referred to as an environmental report(ER).

(C) When an EA is required, the applicant must prepare an EA that meets the requirements in subpart C of this part, including, but not limited to, information and data collection and public involvement activities. When the applicant prepares the EA, the Agency will make its own independent evaluation of the environmental issues and take responsibility for the scope and content of the EA.

(D) Applicants must cooperate with and assist the Agency in all aspects of preparing an EIS that meets the requirements specified in subpart D of this part, including, but not limited to, information and data collection and public involvement activities. Once authorized by the Agency in writing, applicants are responsible for funding all third-party contractors used to prepare the EIS.

(4) Applicants must provide any additional studies, data, and document revisions requested by the Agency during the environmental review and decision-making process. The studies, data, and documents required will vary depending upon the specific project and its impacts. Examples of studies that the Agency may require an applicant to provide are biological assessments under the ESA, archeological surveys under the NHPA, wetland delineations, surveys to determine the floodplain elevation on a site, air quality conformity analysis, or other such information needed to adequately assess impacts.

(5) Applicants must ensure that no actions are taken (such as any demolition, land clearing, initiation of construction, or advance of interim construction funds from a guaranteed lender), including incurring any obligations with respect to their proposal, that may have an adverse impact on the quality of the human environment or that may limit the choice of reasonable alternatives during the environmental review process. Limitations on actions by an applicant prior to the completion of the Agency environmental review process are defined in CEQ regulations at 40 CFR 1506.1 and 7 CFR 1970.12.

(6) Applicants must promptly notify the Agency processing official when changes are made to their proposal so that the environmental review and documentation may be supplemented or otherwise revised as necessary.

(7) Applicants must incorporate any mitigation measures identified and any required monitoring in the environmental review process into the plans and specifications and construction contracts for the proposals. Applicants must provide such mitigation measures to consultants responsible for preparing design and construction documents, or provide other mitigation action plans. Applicants must maintain, as applicable, mitigation measures for the life of the loans or refund term for grants.

(8) Applicants must cooperate with the Agency on achieving environmental policy goals. If an applicant is unwilling to cooperate with the Agency on environmental compliance, the Agency will deny the requested financial assistance.

§ 1970.6 - Definitions and acronyms.

(a) Definitions. Terms used in this part are defined in 40 CFR part 1508, 36 CFR 800.16, and this section. If a term is defined in this section and in one or both of the other referenced regulations, such term will have the meaning as defined in this subpart.

Agency. USDA Rural Development, which includes RBS, RHS, and RUS, and any successor agencies.

Applicant. An individual or entity requesting financial assistance including but not limited to loan recipients, grantees, guaranteed lenders, or licensees.

Average megawatt. The equivalent capacity rating of a generating facility based on the gross energy output generated over a 12-month period or one year.

Construction work plan. An engineering planning study that is used in the Electric Program to determine and document a borrower's 2- to 4-year capital construction investments that are needed to provide and maintain adequate and reliable electric service to a borrower's new and existing members.

Cooperative agreement. For the purposes of this part, a cooperative agreement is a form of financial assistance in which the Agency provides funding that is authorized by public statute, not to be repaid, and for a purpose that includes substantial involvement and a mutual interest of both the Agency and the cooperator.

Critical action. Any activity for which even a slight chance of flooding would be hazardous as determined by the Agency. Critical actions include activities that create, maintain, or extend the useful life of structures or facilities that produce, use, or store highly volatile, flammable, explosive, toxic, or water-reactive materials; maintain irreplaceable records; or provide essential utility or emergency services (such as data storage centers, electric generating facilities, water treatment facilities, wastewater treatment facilities, large pump stations, emergency operations centers including fire and police stations, and roadways providing sole egress from flood-prone areas); or facilities that are likely to contain occupants who may not be sufficiently mobile to avoid death or serious injury in a flood.

Design professional. An engineer or architect providing professional design services to applicants during the planning, design, and construction phases of proposals submitted to the Agency for financial assistance.

Distributed resources. Sources of electrical power that are not directly connected to a bulk power transmission system, having an installed capacity of not more than 10 Mega volt-amperes (MVA), connected to an electric power system through a point of common coupling. Distributed resources include both generators (distributed generation) and energy storage technologies.

Emergency. A disaster or a situation that involves an immediate or imminent threat to public health or safety as determined by the Agency.

Environmental report. The environmental documentation that is required of applicants for proposed actions eligible for a CE under § 1970.54.

Environmental review. Any or all of the levels of environmental analysis described under this part.

Financial assistance. A loan, grant, cooperative agreement, or loan guarantee that provides financial assistance, provided by the Agency to an applicant. In accordance with 40 CFR 1505.1(b), the Agency defines the major decision point at which NEPA must be complete, as the approval of financial assistance.

Grant. A form of financial assistance for a specified purpose without scheduled repayment.

Guaranteed lender. The organization making, servicing, or collecting the loan which is guaranteed by the Agency under applicable regulations, excluding the Federal Financing Bank.

Historic property. Any prehistoric or historic district, site, building, structure, or object included in, or eligible for inclusion in, the National Register of Historic Places maintained by the Secretary of the Interior. This term includes artifacts, records, and remains that are related to and located within such properties. The term includes properties of traditional religious and cultural importance to an Indian tribe or Native Hawaiian organization and that meet the National Register criteria. (See 36 CFR 800.16(l)).

Indian tribe. An Indian tribe, band, nation, or other organized group or community, including a native village, regional corporation or village corporation, as those terms are defined in Section 3 of the Alaska Native Claims Settlement Act (43 U.S.C. 1602), which is recognized as eligible for the special programs and services provided by the United States to Indians because of their status as Indians (see 36 CFR 800.16(m)).

Lien sharing. Agreement to pro rata payment on shared secured collateral without priority preference.

Lien subordination. The circumstance in which the Agency, as a first lien holder, provides a creditor with a priority security interest in secured collateral.

Loan. The provision of funds by the Agency directly to an applicant in exchange for repayment with interest and collateral to secure repayment.

Loan guarantee. The circumstance in which the Agency guarantees all or a portion of payment of a debt obligation to a lender.

Loan/System design. An engineering study, prepared to support a loan application under this part, demonstrating that a system design provides telecommunication services most efficiently to proposed subscribers in a proposed service area, in accordance with the Telecommunications Program guidance.

Multi-tier action. Financial assistance provided by specific programs administered by the Agency, that provides financial assistance to eligible recipients, including but not limited to: Intermediaries; community-based organizations, such as housing or community development non-profit organizations; rural electric cooperatives; or other organizations with similar financial arrangements who, in turn, provide financial assistance to eligible recipients. The entities or organizations receiving the initial Agency financial assistance are considered “primary recipients.” As the direct recipient of this financial assistance, “primary recipients” provide the financial assistance to other parties, referred to as “secondary recipients” or “ultimate recipients.” The multi-tier action programs include Housing Preservation Grants (42 U.S.C. 1490m), Multi-Family Housing Preservation Revolving Loan Fund (7 CFR part 3560), Intermediary Relending Program (7 U.S.C. 1932 note and 42 U.S.C. 9812), Rural Business Development Grant Program (7 U.S.C. 940c and 7 U.S.C. 1932(c)), Rural Economic Development Loan and Grant Program (7 U.S.C. 940c), Rural Microentrepreneur Assistance Program (7 U.S.C. 1989(a), 7 U.S.C. 2008s), Household Water Well System Grant Program (7 U.S.C. 1926e), Revolving Funds for Financing Water and Wastewater Projects (Revolving Fund Program) (7 U.S.C. 1926(a)(2)(B)), Energy Efficiency and Conservation Loan Program (7 U.S.C. 901), Section 313A, Guarantees for Bonds and Notes Issued for Electrification or Telephone Purposes (7 U.S.C. 940c-1), Rural Energy Savings Program (7 U.S.C. 8107a), and any other such programs or similar financial assistance actions to primary recipients as described above.

No action alternative. An alternative that describes the reasonably foreseeable future environment in the event a proposed Federal action is not taken. This forms the baseline condition against which the impacts of the proposed action and other alternatives are compared and evaluated.

Preliminary Architectural/Engineering Report. Documents prepared by the applicant's design professional in accordance with applicable Agency guidance for Preliminary Architectural Reports for housing, business, and community facilities proposals and for Preliminary Engineering Reports for water and wastewater proposals.

Previously disturbed or developed land. Land that has been changed such that its functioning ecological processes have been and remain altered by human activity. The phrase encompasses areas that have been transformed from natural cover to non-native species or a managed state, including, but not limited to, utility and electric power transmission corridors and rights-of-way, and other areas where active utilities and currently used roads are readily available.

Servicing actions. All routine, ministerial, or administrative actions for Agency-provided financial assistance that do not involve new financial assistance, including, but not limited to:

(1) Advancing of funds, billing, processing payments, transfers, assumptions, refinancing involving only a change in an interest rate, and accepting prepayments;

(2) Monitoring collateral; foreclosure; compromising, adjusting, reducing, or charging off debts or claims; and modifying or releasing the terms of security instruments, leases, contracts, and agreements; and

(3) Consents or approvals provided pursuant to loan contracts, agreements, and security instruments.

Substantial improvement. Any repair, reconstruction or other improvement of a structure or facility, which has been damaged in excess of, or the cost of which equals or exceeds, 50% of the market value of the structure or replacement cost of the facility (including all “public facilities” as defined in the Disaster Relief Act of 1974) before the repair or improvement is started, or, if the structure or facility has been damaged and is proposed to be restored, before the damage occurred. If a facility is an essential link in a larger system, the percentage of damage will be based on the relative cost of repairing the damaged facility to the replacement cost of the portion of the system which is operationally dependent on the facility. The term “substantial improvement” does not include any alteration of a structure or facility listed on the National Register of Historic Places or a State Inventory of Historic Places. (See 44 CFR 59.1.)

Third-party contractor. Contractors for the preparation of EISs, under the Agency's direction, and paid by the applicant. Under the Agency's direction and in compliance with 40 CFR 1506.5(c), the applicant may undertake the necessary paperwork for the solicitation of a field of candidates. Federal procurement requirements do not apply to the Agency because it incurs no obligations or costs under the contract, nor does the Agency procure anything under the contract.

(b) Acronyms.

aMW—Average megawatt CE—Categorical Exclusion CERCLA—Comprehensive Environmental Response, Compensation, and Liability Act CEQ—Council on Environmental Quality EA—Environmental Assessment ER—Environmental Report EIS—Environmental Impact Statement EPA—United States Environmental Protection Agency ESA—Endangered Species Act FEMA—Federal Emergency Management Agency FONSI—Finding of No Significant Impact GHG—Greenhouse Gas kV—kilovolt (kV) kW—kilowatt (kW) MW—megawatt MVA—Mega volt-amperes NEPA—National Environmental Policy Act NHPA—National Historic Preservation Act NOI—Notice of Intent RBIC—Rural Business Investment Company RBS—Rural Business-Cooperative Service RHS—Rural Housing Service RUS—Rural Utilities Service ROD—Record of Decision SEPA—State Environmental Policy Act USDA—United States Department of Agriculture USGS—United States Geological Survey

§ 1970.7 - [Reserved]

§ 1970.8 - Actions requiring environmental review.

(a) The Agency must comply with the requirements of NEPA for all Federal actions within the:

(1) United States borders and any other commonwealth, territory or possession of the United States such as Guam, American Samoa, U.S. Virgin Islands, the Commonwealth of the Northern Mariana Islands, and the Commonwealth of Puerto Rico; and

(2) Republic of the Marshall Islands, the Federated States of Micronesia and the Republic of Palau, subject to applicable Compacts of Free Association.

(b) Except as provided in paragraphs (c), (d), and (e) of this section, the provisions of this part apply to administrative actions by the Agency with regard to the following to be Federal actions:

(1) Providing financial assistance;

(2) Certain post-financial assistance actions with the potential to have an effect on the environment, including:

(i) The sale or lease of Agency-owned real property;

(ii) Lien subordination; and

(iii) Approval of a substantial change in the scope of a project receiving financial assistance not previously considered.

(3) Promulgation of procedures or regulations for new or significantly revised programs; and

(4) Legislative proposals (see 40 Cspan 1506.8).

(c) For environmental review purposes, the Agency has identified and established categories of proposed actions (§§ 1970.53 through 1970.55, 1970.101, and 1970.151). An applicant may propose to participate with other parties in the ownership of a project. In such a case, the Agency will determine whether the applicant participants have sufficient control and responsibility to alter the development of the proposed project prior to determining its classification. Only if there is such control and responsibility as described below will the Agency consider its action with regard to the project to be a Federal action for purposes of this part. Where the applicant proposes to participate with other parties in the ownership of a proposed project and all applicants cumulatively own:

(1) Five percent (5%) or less, the project is not considered a Federal action subject to this part;

(2) Thirty-three and one-third percent (33 1/3%) or more, the project shall be considered a Federal action subject to this part;

(3) More than five percent (5%) but less than thirty-three and one-third percent (33 1/3%), the Agency will determine whether the applicant participants have sufficient control and responsibility to alter the development of the proposal such that the Agency's action will be considered a Federal action subject to this part. In making this determination, the Agency will consider such factors as:

(i) Whether construction would be completed regardless of the Agency's financial assistance or approval;

(ii) The stage of planning and construction;

(iii) Total participation of the applicant;

(iv) Participation percentage of each participant; and

(v) Managerial arrangements and contractual provisions.

(d) Lien sharing is not an action for the purposes of this part.

(e) Servicing actions are directly related to financial assistance already provided, do not require separate NEPA review, and are not actions for the purposes of this part.

§ 1970.9 - Levels of environmental review.

(a) The Agency has identified classes of actions and the level of environmental review required for applicant proposals and Agency actions in subparts B (CEs), C (EAs), and D (EISs) of this part. An applicant seeking financial assistance from the Agency must sufficiently describe its proposal so that the Agency can properly classify the proposal for the purposes of this part.

(b) If an action is not identified in the classes of actions listed in subparts B, C, or D of this part, the Agency will determine what level of environmental review is appropriate.

(c) A single environmental document will evaluate an applicant's proposal and any other activities that are connected, interdependent, or likely to have significant cumulative effects. When a proposal represents one segment of a larger interdependent proposal being funded jointly by various entities, the level of environmental review will normally include the entire proposal.

(d) Upon submission of multi-year planning documents, such as Telecommunications Program Loan/System Designs or multi-year Electric Program Construction Work Plans, the Agency will identify the appropriate classification for all proposals listed in the applicable design or work plan and may request any additional environmental information prior to the time of loan approval.

§ 1970.10 - Raising the level of environmental review.

Environmental conditions, scientific controversy, or other characteristics unique to a specific proposal can trigger the need for a higher level of environmental review than described in subparts B or C of this part. As appropriate, the Agency will determine whether extraordinary circumstances (see § 1970.52) or the potential for significant environmental impacts warrant a higher level of review. The Agency is solely responsible for determining the level of environmental review to be conducted and the adequacy of environmental review that has been performed.

§ 1970.11 - Timing of the environmental review process.

(a) Once an applicant decides to request Agency financial assistance, the applicant must initiate the environmental review process at the earliest possible time to ensure that planning, design, and other decisions reflect environmental policies and values, avoid delays, and minimize potential conflicts. This includes early coordination with the Agency, all funding partners, and regulatory agencies, in order to minimize duplication of effort.

(b) The environmental review process must be concluded before the obligation of funds; except for infrastructure projects where the assurance that funds will be available for community health, safety, or economic development has been determined as necessary by the Agency Administrator. At the discretion of the Agency Administrator, funds may be obligated contingent upon the conclusion of the environmental review process prior to any action that would have an adverse effect on the environment or limit the choices of any reasonable alternatives. Funds so obligated shall be rescinded if the Agency cannot conclude the environmental review process before the end of the fiscal year after the year in which the funds were obligated, or if the Agency determines that it cannot proceed with approval based on findings in the environmental review process. For the purposes of this section, infrastructure projects shall include projects such as broadband, telecommunications, electric, energy efficiency, smart grid, water, sewer, transportation, and energy capital investments in physical plant and equipment, but not investments authorized in the Housing Act of 1949.

(c) The environmental review process is formally concluded when all of the following have occurred:

(1) The Agency has reviewed the appropriate environmental review document for completeness;

(2) All required public notices have been published and public comment periods have elapsed;

(3) All comments received during any established comment period have been considered and addressed, as appropriate by the Agency;

(4) The environmental review documents have been approved by the Agency; and

(5) The appropriate environmental decision document has been executed by the Agency after paragraphs (c)(1) through (4) of this section have been concluded.

(d) For proposed actions listed in § 1970.151 and to ensure Agency compliance with the conflict of interest provisions in 40 CFR 1506.5(c), the Agency is responsible for selecting any third-party EIS contractor and participating in the EIS preparation. For more information regarding acquisition of professional services and funding of a third-party contractor, refer to § 1970.152.

[81 FR 11032, Mar. 2, 2016, as amended at 83 FR 59271, Nov. 23, 2018; 84 FR 49648, Sept. 23, 2019]

§ 1970.12 - Limitations on actions during the NEPA process.

(a) Limitations on actions. Applicants must not take actions concerning a proposal that may potentially have an environmental impact or would otherwise limit or affect the Agency's decision until the Agency's environmental review process is concluded. If such actions are taken prior to the conclusion of the environmental review process, the Agency may deny the request for financial assistance.

(b) Anticipatory demolition. If the Agency determines that an applicant has intentionally significantly adversely affected a historic property with the intent to avoid the requirements of Section 106 of the NHPA (such as demolition or removal of all or part of the property) the Agency may deny the request for financial assistance in accordance with section 110(k) of the NHPA.

(c) Recent construction. When construction is in progress or has recently been completed by applicants who can demonstrate no prior intent to seek Agency assistance at the time of application submittal to the Agency, the following requirements apply:

(1) In cases where construction commenced within 6 months prior to the date of application, the Agency will determine and document whether the applicant initiated construction to avoid environmental compliance requirements. If any evidence to that effect exists, the Agency may deny the request for financial assistance.

(2) If there is no evidence that an applicant is attempting to avoid environmental compliance requirements, the application is subject to the following additional requirements:

(i) The Agency will promptly provide written notice to the applicant that the applicant must halt construction if it is ongoing and fulfill all environmental compliance responsibilities before the requested financing will be provided;

(ii) The applicant must take immediate steps to identify any environmental resources affected by the construction and protect the affected resources; and

(iii) With assistance from the applicant and to the extent practicable, the Agency will determine whether environmental resources have been adversely affected by any construction and this information will be included in the environmental document.

(d) Minimal expenditures. In accordance with 40 CFR 1506.1(d), the Agency will not be precluded from approving minimal expenditures by the applicant not affecting the environment (e.g., long lead-time equipment, purchase options, or environmental or technical documentation needed for Agency environmental review). To be minimal, the expenditure must not exceed the amount of loss which the applicant could absorb without jeopardizing the Government's security interest in the event the proposed action is not approved by the Agency, and must not compromise the objectivity of the Agency's environmental review process.

§ 1970.13 - Consideration of alternatives.

The purpose of considering alternatives to a proposed action is to explore and evaluate whether there may be reasonable alternatives to that action that may have fewer or less significant negative environmental impacts. When considering whether the alternatives are reasonable, the Agency will take into account factors such as economic and technical feasibility. The extent of the analysis on each alternative will depend on the nature and complexity of the proposal. Environmental review documents must discuss the consideration of alternatives as follows:

(a) For proposals subject to subpart C of this part, the environmental effects of the “No Action” alternative must be evaluated. All EAs must evaluate other reasonable alternatives whenever the proposal involves potential adverse effects to environmental resources.

(b) For proposals subject to subpart D of this part, the Agency will follow the requirements in 40 CFR part 1502.

§ 1970.14 - Public involvement.

(a) Goal. The goal of public involvement is to engage affected or interested parties and share information and solicit input regarding environmental impacts of proposals. This helps the Agency to better identify potential environmental impacts and mitigation measures and allows the public to review and comment on proposals under consideration by the Agency. The nature and extent of public involvement will depend upon the public interest and the complexity, sensitivity, and potential for significant environmental impacts of the proposal.

(b) Responsibility to involve the public. The Agency will require applicant assistance throughout the environmental review process, as appropriate, to involve the public as required under 40 CFR 1506.6. These activities may include, but are not limited to:

(1) Coordination with Federal, state, and local agencies; Federally recognized American Indian tribes; Alaska Native organizations; Native Hawaiian organizations; and the public;

(2) Providing meaningful opportunities for involvement of affected minority or low-income populations, which may include special outreach efforts, so that potential disproportionate effects on minority or low-income populations are reduced to the maximum extent practicable;

(3) Publication of notices;

(4) Organizing and conducting meetings; and

(5) Providing translators, posting information on electronic media, or any other additional means needed that will successfully inform the public.

(c) Scoping. In accordance with 40 CFR 1501.7, scoping is an early and open process to identify significant environmental issues deserving of study, de-emphasize insignificant issues, and determine the scope of the environmental review process.

(1) Public scoping meetings allow the public to obtain information about a proposal and to express their concerns directly to the parties involved and help determine what issues are to be addressed and what kinds of expertise, analysis, and consultation are needed. For proposals classified in §§ 1970.101 and 1970.151, scoping meetings may be required at the Agency's discretion. The Agency may require a scoping meeting whenever the proposal has substantial controversy, scale, or complexity.

(2) If required, scoping meetings will be held at reasonable times, in accessible locations, and in the geographical area of the proposal at a location the Agency determines would best afford an opportunity for public involvement.

(3) When held, applicants must attend and participate in all scoping meetings. When requested by the Agency, the applicant must organize and arrange meeting locations, publish public notices, provide translation, provide for any equipment needs such as those needed to allow for remote participation, present information on their proposal, and fulfill any related activities.

(d) Public notices. (1) The Agency is responsible for meeting the public notice requirements in 40 CFR 1506.6, but will require the applicant to provide public notices of the availability of environmental documents and of public meetings so as to inform those persons and agencies who may be interested in or affected by an applicant's proposal. The Agency will provide applicants with guidance as to specific notice content, publication frequencies, and distribution requirements. Public notices issued by the Agency or the applicant must describe the nature, location, and extent of the applicant's proposal and the Agency's proposed action; notices must also indicate the availability and location of pertinent information.

(2) Notices generally must be published in a newspaper(s) of general circulation (both in print and online) within the proposal's affected areas and other places as determined by the Agency. The notice must be published in the non-classified section of the newspaper. If the affected area is largely non-English speaking or bilingual, the notice must be published in both English and non-English language newspapers serving the affected area, if both are available. The Agency will determine the use of other distribution methods for communicating information to affected individuals and communities if those are more likely to be effective. The applicant must obtain an “affidavit of publication” or other such evidence from all publications (or equivalent verification if other distribution methods were used) and must submit such evidence to the Agency to be made a part of the Agency's Administrative Record.

(3) The number of times notices regarding EAs must be published is specified in § 1970.102(b)(6)(ii). Other distribution methods may be used in special circumstances when a newspaper notice is not available or is not adequate. Additional distribution methods may include, but are not limited to, direct public notices to adjacent property owners or occupants, mass mailings, radio broadcasts, internet postings, posters, or some other combination of public announcements.

(4) Formal notices required for EIS-level proposals pursuant to 40 CFR part 1500 will be published by the Agency in the Federal Register.

(e) Public availability. Documents associated with the environmental review process will be made available to the public at convenient locations specified in public notices and, where appropriate, on the Agency's internet site. Environmental documents that are voluminous or contain hard-to-reproduce graphics or maps should be made available for viewing at one or more locations, such as an Agency field office, public library, or the applicant's place of business. Upon request, the Agency will promptly provide interested parties copies of environmental review documents without charge to the extent practicable, or at a fee not to exceed the cost of reproducing and shipping the copies.

(f) Public comments. All comments should be directed to the Agency. Comments received by applicants must be forwarded to the Agency in a timely manner. The Agency will assess and consider all comments received.

§ 1970.15 - Interagency cooperation.

In order to reduce delay and paperwork, the Agency will, when practicable, eliminate duplication of Federal, state, and local procedures by participating in joint environmental document preparation, adopting appropriate environmental documents prepared for or by other Federal agencies, and incorporating by reference other environmental documents in accordance with 40 CFR 1506.2 and 1506.3.

(a) Coordination with other Federal agencies. When other Federal agencies are involved in an Agency action listed in § 1970.101 or § 1970.151, the Agency will coordinate with these agencies to determine cooperating agency relationships as appropriate in the preparation of a joint environmental review document. The criteria for making this determination can be found at 40 CFR 1501.5.

(b) Adoption of documents prepared for or by other Federal agencies. The Agency may adopt EAs or EISs prepared for or by other Federal agencies if the proposed actions and site conditions addressed in the environmental document are substantially the same as those associated with the proposal being considered by the Agency. The Agency will consider age, location, and other reasonable factors in determining the usefulness of the other Federal documents. The Agency will complete an independent evaluation of the environmental document to ensure it meets the requirements of this part. If any environmental document does not meet all Agency requirements, it will be supplemented prior to adoption. Where there is a conflict in the two agencies' classes of action, the Agency may adopt the document provided that it meets the Agency's requirements.

(c) Cooperation with state and local governments. In accordance with 40 CFR 1500.5 and 1506.2, the Agency will cooperate with state and local agencies to the fullest extent possible to reduce delay and duplication between NEPA and comparable state and local requirements.

(1) Joint environmental documents. To the extent practicable, the Agency will participate in the preparation of a joint document to ensure that all of the requirements of this part are met. Applicants that request Agency assistance for specific proposals must contact the Agency at the earliest possible date to determine if joint environmental documents can be effectively prepared. In order to prepare joint documents the following conditions must be met:

(i) Applicants must also be seeking financial, technical, or other assistance such as permitting or approvals from a state or local agency that has responsibility to complete an environmental review for the applicant's proposal; and

(ii) The Agency and the state or local agency may agree to be joint lead agencies where practicable. When state laws or local ordinances have environmental requirements in addition to, but not in conflict with those of the Agency, the Agency will cooperate in fulfilling these requirements.

(2) Incorporating other documents. The Agency cannot adopt a non-Federal environmental document under NEPA. However, if an environmental document is not jointly prepared as described in paragraph (c)(1) of this section (e.g., prepared in accordance with a state environmental policy act [SEPA]), the Agency will evaluate the document as reference or supporting material for the Agency's environmental document.

§ 1970.16 - Mitigation.

(a) The goal of mitigation is to avoid, minimize, rectify, reduce, or compensate for the adverse environmental impacts of an action. The Agency will seek to mitigate potential adverse environmental impacts resulting from Agency actions. All mitigation measures will be included in Agency commitment or decision documents.

(b) Mitigation measures, where necessary for a FONSI or a ROD, will be discussed with the applicant and with any other relevant agency and, to the extent practicable, incorporated into Agency commitment documents, plans and specifications, and construction contracts so as to be legally binding.

(c) The Agency, applicable lenders, or any intermediaries will monitor implementation of all mitigation measures during development of design, final plans, inspections during the construction phase of projects, as well as in future servicing visits. The Agency will direct applicants to take necessary measures to bring the project into compliance. If the applicant fails to achieve compliance, all advancement of funds and the approval of cost reimbursements will be suspended. Other measures may be taken by the Agency to redress the failed mitigation as appropriate.

§ 1970.17 - Programmatic analyses and tiering.

In accordance with 40 CFR 1502.20 and to foster better decision making, the Agency may consider preparing programmatic-level NEPA analyses and tiering to eliminate repetitive discussions of the same issues and to focus on the actual issues ripe for decision at each level of environmental review.

§ 1970.18 - Emergencies.

When an emergency exists and the Agency determines that it is necessary to take emergency action before preparing a NEPA analysis and any required documentation, the provisions of this section apply.

(a) Urgent response. The Agency and the applicant, as appropriate, may take actions necessary to control the immediate impacts of an emergency (see § 1970.53(e)). Emergency actions include those that are urgently needed to restore services and to mitigate harm to life, property, or important natural or cultural resources. When taking such actions, the Agency and the applicant, when applicable, will take into account the probable environmental consequences of the emergency action and mitigate foreseeable adverse environmental effects to the extent practicable.

(b) CE- and EA-level actions. If the Agency proposes longer-term emergency actions other than those actions described in paragraph (a) of this section, and such actions are not likely to have significant environmental impacts, the Agency will document that determination in a finding for a CE or in a FONSI for an EA prepared in accordance with this part. If the Agency finds that the nature and scope of proposed emergency actions are such that they must be undertaken prior to preparing any NEPA analysis and documentation associated with a CE or EA, the Agency will identify alternative arrangements for compliance with this part with the appropriate agencies.

(1) Alternative arrangements for environmental compliance are limited to actions necessary to control the immediate impacts of the emergency.

(2) Alternative arrangements will, to the extent practicable, attempt to achieve the substantive requirements of this part.

(c) EIS-level actions. If the Agency proposes emergency actions other than those actions described in paragraphs (a) or (b) of this section and such actions are likely to have significant environmental impacts, then the Agency will consult with the CEQ about alternative arrangements in accordance with CEQ regulations at 40 CFR 1506.11 as soon as possible.

§§ 1970.19-1970.50 - §[Reserved]