Collapse to view only § 56.19028 - End attachment replacement.
Hoists
- SECTION § 56.19001 - Rated capacities.
- SECTION § 56.19002 - Anchoring.
- SECTION § 56.19003 - Driving mechanism connections.
- SECTION § 56.19004 - Brakes.
- SECTION § 56.19005 - Locking mechanism for clutch.
- SECTION § 56.19006 - Automatic hoist braking devices.
- SECTION § 56.19007 - Overtravel and overspeed devices.
- SECTION § 56.19008 - Friction hoist synchronizing mechanisms.
- SECTION § 56.19009 - Position indicator.
- SECTION § 56.19010 - Location of hoist controls.
- SECTION § 56.19011 - Drum flanges.
- SECTION § 56.19012 - Grooved drums.
- SECTION § 56.19013 - Diesel- and other fuel-injection-powered hoists.
- SECTION § 56.19014 - Friction hoist overtravel protection.
- SECTION § 56.19017 - Emergency braking for electric hoists.
- SECTION § 56.19018 - Overtravel by-pass switches.
- § 56.19000 - Application.
Wire Ropes
- SECTION § 56.19021 - Minimum rope strength.
- SECTION § 56.19022 - Initial measurement.
- SECTION § 56.19023 - Examinations.
- SECTION § 56.19024 - Retirement criteria.
- SECTION § 56.19025 - Load end attachments.
- SECTION § 56.19026 - Drum end attachment.
- SECTION § 56.19027 - End attachment retermination.
- SECTION § 56.19028 - End attachment replacement.
- SECTION § 56.19030 - Safety device attachments.
Headframes and Sheaves
Conveyances
Hoisting Procedures
- SECTION § 56.19055 - Availability of hoist operator for manual hoists.
- SECTION § 56.19056 - Availability of hoist operator for automatic hoists.
- SECTION § 56.19057 - Hoist operator's physical fitness.
- SECTION § 56.19058 - Experienced hoist operators.
- SECTION § 56.19061 - Maximum hoisting speeds.
- SECTION § 56.19062 - Maximum acceleration and deceleration.
- SECTION § 56.19063 - Persons allowed in hoist room.
- SECTION § 56.19065 - Lowering conveyances by the brakes.
- SECTION § 56.19066 - Maximum riders in a conveyance.
- SECTION § 56.19067 - Trips during shift changes.
- SECTION § 56.19068 - Orderly conduct in conveyances.
- SECTION § 56.19069 - Entering and leaving conveyances.
- SECTION § 56.19070 - Closing cage doors or gates.
- SECTION § 56.19071 - Riding in skips or buckets.
- SECTION § 56.19072 - Skips and cages in same compartment.
- SECTION § 56.19073 - Hoisting during shift changes.
- SECTION § 56.19074 - Riding the bail, rim, bonnet, or crosshead.
- SECTION § 56.19075 - Use of open hooks.
- SECTION § 56.19076 - Maximum speeds for hoisting persons in buckets.
- SECTION § 56.19077 - Lowering buckets.
- SECTION § 56.19078 - Hoisting buckets from the shaft bottom.
- SECTION § 56.19079 - Blocking mine cars.
- SECTION § 56.19080 - Hoisting tools, timbers, and other materials.
- SECTION § 56.19081 - Conveyances not in use.
- SECTION § 56.19083 - Overtravel backout device.
Signaling
- SECTION § 56.19090 - Dual signaling systems.
- SECTION § 56.19091 - Signaling instructions to hoist operator.
- SECTION § 56.19092 - Signaling from conveyances.
- SECTION § 56.19093 - Standard signal code.
- SECTION § 56.19094 - Posting signal code.
- SECTION § 56.19095 - Location of signal devices.
- SECTION § 56.19096 - Familiarity with signal code.
Shafts
- SECTION § 56.19100 - Shaft landing gates.
- SECTION § 56.19101 - Stopblocks and derail switches.
- SECTION § 56.19102 - Shaft guides.
- SECTION § 56.19103 - Dumping facilities and loading pockets.
- SECTION § 56.19104 - Clearance at shaft stations.
- SECTION § 56.19105 - Landings with more than one shaft entrance.
- SECTION § 56.19106 - Shaft sets.
- SECTION § 56.19107 - Precautions for work in compartment affected by hoisting operation.
- SECTION § 56.19108 - Posting warning signs during shaft work.
- SECTION § 56.19109 - Shaft inspection and repair.
- SECTION § 56.19110 - Overhead protection for shaft deepening work.
- SECTION § 56.19111 - Shaft-sinking ladders.
Inspection and Maintenance
- SECTION § 56.19120 - Procedures for inspection, testing, and maintenance.
- SECTION § 56.19121 - Recordkeeping.
- SECTION § 56.19122 - Replacement parts.
- SECTION § 56.19129 - Examinations and tests at beginning of shift.
- SECTION § 56.19130 - Conveyance shaft test.
- SECTION § 56.19131 - Hoist conveyance connections.
- SECTION § 56.19132 - Safety catches.
- SECTION § 56.19133 - Shaft.
- SECTION § 56.19134 - Sheaves.
- SECTION § 56.19135 - Rollers in inclined shafts.
Hoists
§ 56.19001 - Rated capacities.
Hoists shall have rated capacities consistent with the loads handled and the recommended safety factors of the ropes used.
§ 56.19002 - Anchoring.
Hoists shall be anchored securely.
§ 56.19003 - Driving mechanism connections.
Belt, rope, or chains shall not be used to connect driving mechanisms to man hoists.
§ 56.19004 - Brakes.
Any hoist used to hoist persons shall be equipped with a brake or brakes which shall be capable of holding its fully loaded cage, skip, or bucket at any point in the shaft.
§ 56.19005 - Locking mechanism for clutch.
The operating mechanism of the clutch of every man-hoist drum shall be provided with a locking mechanism, or interlocked electrically or mechanically with the brake to prevent accidental withdrawal of the clutch.
§ 56.19006 - Automatic hoist braking devices.
Automatic hoists shall be provided with devices that automatically apply the brakes in the event of power failure.
§ 56.19007 - Overtravel and overspeed devices.
All man hoists shall be provided with devices to prevent overtravel. When utilized in shafts exceeding 100 feet in depth, such hoists shall also be provided with overspeed devices.
§ 56.19008 - Friction hoist synchronizing mechanisms.
Where creep or slip may alter the effective position of safety devices, friction hoists shall be equipped with synchronizing mechanisms that recalibrate the overtravel devices and position indicators.
§ 56.19009 - Position indicator.
An accurate and reliable indicator of the position of the cage, skip, bucket, or cars in the shaft shall be provided.
§ 56.19010 - Location of hoist controls.
Hoist controls shall be placed or housed so that the noise from machinery or other sources will not prevent hoistmen from hearing signals.
§ 56.19011 - Drum flanges.
Flanges on drums shall extend radially a minimum of 4 inches or three rope diameters beyond the last wrap, whichever is the lesser.
§ 56.19012 - Grooved drums.
Where grooved drums are used, the grooves shall be of suitable size and pitch for the ropes used.
§ 56.19013 - Diesel- and other fuel-injection-powered hoists.
Where any diesel or similar fuel-injection engine is used to power a hoist, the engine shall be equipped with a damper or other cutoff in its air intake system. The control handle shall be clearly labeled to indicate that its intended function is for emergency stopping only.
§ 56.19014 - Friction hoist overtravel protection.
In a friction hoist installation, tapered guides or other approved devices shall be installed above and below the limits of regular travel of the conveyance and arranged to prevent overtravel in the event of failure of other devices.
§ 56.19017 - Emergency braking for electric hoists.
Each electric hoist shall be equipped with a manually-operable switch that will initiate emergency braking action to bring the conveyance and the counterbalance safely to rest. This switch shall be located within reach of the hoistman in case the manual controls of the hoist fail.
§ 56.19018 - Overtravel by-pass switches.
When an overtravel by-pass switch is installed, the switch shall function so as to allow the conveyance to be moved through the overtravel position when the switch is held in the closed position by the hoistman. The overtravel by-pass switch shall return automatically to the open position when released by the hoistman.
§ 56.19000 - Application.
(a) The hoisting standards in this subpart apply to those hoists and appurtenances used for hoisting persons. However, where persons may be endangered by hoists and appurtenances used solely for handling ore, rock, and materials, the appropriate standards should be applied.
(b) Standards 56.19021 through 56.19028 apply to wire ropes in service used to hoist persons with an incline hoist on the surface.
(c) Emergency hoisting facilities should conform to the extent possible to safety requirements for other hoists, and should be adequate to remove the persons from the mine with a minimum of delay.
Wire Ropes
§ 56.19021 - Minimum rope strength.
At installation, the nominal strength (manufacturer's published catalog strength) of wire ropes used for hoisting shall meet the minimum rope strength values obtained by the following formulas in which “L” equals the maximum suspended rope length in feet:
(a) Winding drum ropes (all constructions, including rotation resistant).
For rope lengths less than 3,000 feet: Minimum Value = Static Load × (7.0-0.001L) For rope lengths 3,000 feet or greater: Minimum Value = Static Load × 4.0(b) Friction drum ropes.
For rope lengths less than 4,000 feet: Minimum Value = Static Load × (7.0-0.0005L) For rope lengths 4,000 feet or greater: Minimum Value = Static Load × 5.0(c) Tail ropes (balance ropes).
Minimum Value = Weight of Rope × 7.0§ 56.19022 - Initial measurement.
After initial rope stretch but before visible wear occurs, the rope diameter of newly installed wire ropes shall be measured at least once in every third interval of active length and the measurements averaged to establish a baseline for subsequent measurements. A record of the measurements and the date shall be made by the person taking the measurements. This record shall be retained until the rope is retired from service.
§ 56.19023 - Examinations.
(a) At least once every fourteen calendar days, each wire rope in service shall be visually examined along its entire active length for visible structural damage, corrosion, and improper lubrication or dressing. In addition, visual examination for wear and broken wires shall be made at stress points, including the area near attachments, where the rope rests on sheaves, where the rope leaves the drum, at drum crossovers, and at change-of-layer regions. When any visible condition that results in a reduction of rope strength is present, the affected portion of the rope shall be examined on a daily basis.
(b) Before any person is hoisted with a newly installed wire rope or any wire rope that has not been examined in the previous fourteen calendar days, the wire rope shall be examined in accordance with paragraph (a) of this section.
(c) At least once every six months, nondestructive tests shall be conducted of the active length of the rope, or rope diameter measurements shall be made—
(1) Wherever wear is evident;
(2) Where the hoist rope rests on sheaves at regular stopping points;
(3) Where the hoist rope leaves the drum at regular stopping points; and
(4) At drum crossover and change-of-layer regions.
(d) At the completion of each examination required by paragraph (a) of this section, the person making the examination shall certify, by signature and date, that the examination has been made. If any condition listed in paragraph (a) of this section is present, the person conducting the examination shall make a record of the condition and the date. Certifications and records of examinations shall be retained for one year.
(e) The person making the measurements or nondestructive tests as required by paragraph (c) of this section shall record the measurements or test results and the date. This record shall be retained until the rope is retired from service.
§ 56.19024 - Retirement criteria.
Unless damage or deterioration is removed by cutoff, wire ropes shall be removed from service when any of the following conditions occurs:
(a) The number of broken wires within a rope lay length, excluding filler wires, exceeds either—
(1) Five percent of the total number of wires; or
(2) Fifteen percent of the total number of wires within any strand.
(b) On a regular lay rope, more than one broken wire in the valley between strands in one rope lay length.
(c) A loss of more than one-third of the original diameter of the outer wires.
(d) Rope deterioration from corrosion.
(e) Distortion of the rope structure.
(f) Heat damage from any source.
(g) Diameter reduction due to wear that exceeds six percent of the baseline diameter measurement.
(h) Loss of more than ten percent of rope strength as determined by nondestructive testing.
§ 56.19025 - Load end attachments.
(a) Wire rope shall be attached to the load by a method that develops at least 80 percent of the nominal strength of the rope.
(b) Except for terminations where use of other materials is a design feature, zinc (spelter) shall be used for socketing wire ropes. Design feature means either the manufacturer's original design or a design approved by a registered professional engineer.
(c) Load end attachment methods using splices are prohibited.
§ 56.19026 - Drum end attachment.
(a) For drum end attachment, wire rope shall be attached—
(1) Securely by clips after making one full turn around the drum spoke;
(2) Securely by clips after making one full turn around the shaft, if the drum is fixed to the shaft; or
(3) By properly assembled anchor bolts, clamps, or wedges, provided that the attachment is a design feature of the hoist drum. Design feature means either the manufacturer's original design or a design approved by a registered professional engineer.
(b) A minimum of three full turns of wire rope shall be on the drum when the rope is extended to its maximum working length.
§ 56.19027 - End attachment retermination.
Damaged or deteriorated wire rope shall be removed by cutoff and the rope reterminated where there is—
(a) More than one broken wire at an attachment;
(b) Improper installation of an attachment;
(c) Slippage at an attachment; or
(d) Evidence of deterioration from corrosion at an attachment.
§ 56.19028 - End attachment replacement.
Wire rope attachments shall be replaced when cracked, deformed, or excessively worn.
§ 56.19030 - Safety device attachments.
Safety device attachments to hoist ropes shall be selected, installed, and maintained according to manufacturers' specifications to minimize internal corrosion and weakening of the hoist rope.
Headframes and Sheaves
§ 56.19035 - Headframe design.
All headframes shall be constructed with suitable design considerations to allow for all dead loads, live loads, and wind loads.
§ 56.19036 - Headframe height.
Headframes shall be high enough to provide clearance for overtravel and safe stopping of the conveyance.
§ 56.19037 - Fleet angles.
Fleet angles on hoists installed after November 15, 1979, shall not be greater than one and one-half degrees for smooth drums or two degrees for grooved drums.
§ 56.19038 - Platforms around elevated head sheaves.
Platforms with toeboards and handrails shall be provided around elevated head sheaves.
Conveyances
§ 56.19045 - Metal bonnets.
Man cages and skips used for hoisting or lowering employees or other persons in any vertical shaft or any incline-shaft with an angle of inclination of forty-five degrees from the horizontal, shall be covered with a metal bonnet.
§ 56.19049 - Hoisting persons in buckets.
Buckets shall not be used to hoist persons except during shaft sinking operations, inspection, maintenance, and repairs.
§ 56.19050 - Bucket requirements.
Buckets used to hoist persons during vertical shaft sinking operations shall—
(a) Be securely attached to a crosshead when traveling in either direction between the lower and upper crosshead parking locations;
(b) Have overhead protection when the shaft depth exceeds 50 feet;
(c) Have sufficient depth or a suitably designed platform to transport persons safely in a standing position; and
(d) Have devices to prevent accidental dumping where the bucket is supported by a bail attached to its lower half.
§ 56.19054 -
Where rope guides are used in shafts other than in shaft sinking operations, the rope guides shall be a type of lock coil construction.
Hoisting Procedures
§ 56.19055 - Availability of hoist operator for manual hoists.
When a manually operated hoist is used, a qualified hoistman shall remain within hearing of the telephone or signal device at all times while any person is underground.
§ 56.19056 - Availability of hoist operator for automatic hoists.
When automatic hoisting is used, a competent operator of the hoist shall be readily available at or near the hoisting device while any person is underground.
§ 56.19057 - Hoist operator's physical fitness.
No person shall operate a hoist unless within the preceding 12 months he has had a medical examination by a qualified, licensed physician who shall certify his fitness to perform this duty. Such certification shall be available at the mine.
§ 56.19058 - Experienced hoist operators.
Only experienced hoistmen shall operate the hoist except in cases of emergency and in the training of new hoistmen.
§ 56.19061 - Maximum hoisting speeds.
The safe speed for hoisting persons shall be determined for each shaft, and this speed shall not be exceeded. Persons should not be hoisted at a speed faster than 2,500 feet per minute, except in an emergency.
§ 56.19062 - Maximum acceleration and deceleration.
Maximum normal operating acceleration and deceleration shall not exceed 6 feet per second per second. During emergency braking, the deceleration shall not exceed 16 feet per second per second.
§ 56.19063 - Persons allowed in hoist room.
Only authorized persons shall be in hoist rooms.
§ 56.19065 - Lowering conveyances by the brakes.
Conveyances shall not be lowered by the brakes alone except during emergencies.
§ 56.19066 - Maximum riders in a conveyance.
In shafts inclined over 45 degrees, the operator shall determine and post in the conveyance or at each shaft station the maximum number of persons permitted to ride in a hoisting conveyance at any one time. Each person shall be provided a minimum of 1.5 square feet of floor space.
§ 56.19067 - Trips during shift changes.
During shift changes, an authorized person shall be in charge of each trip in which persons are hoisted.
§ 56.19068 - Orderly conduct in conveyances.
Persons shall enter, ride, and leave conveyances in an orderly manner.
§ 56.19069 - Entering and leaving conveyances.
Persons shall not enter or leave conveyances which are in motion or after a signal to move the conveyance has been given to the hoistman.
§ 56.19070 - Closing cage doors or gates.
Cage doors or gates shall be closed while persons are being hoisted; they shall not be opened until the cage has come to a stop.
§ 56.19071 - Riding in skips or buckets.
Persons shall not ride in skips or buckets with muck, supplies, materials, or tools other than small hand tools.
§ 56.19072 - Skips and cages in same compartment.
When combinations of cages and skips are used in the same compartment, the cages shall be enclosed to protect personnel from flying material and the hoist speed reduced to man-speed as defined in standard 56.19061, but not to exceed 1,000 feet per minute. Muck shall not be hoisted with personnel during shift changes.
§ 56.19073 - Hoisting during shift changes.
Rock or supplies shall not be hoisted in the same shaft as persons during shift changes, unless the compartments and dumping bins are partitioned to prevent spillage into the cage compartment.
§ 56.19074 - Riding the bail, rim, bonnet, or crosshead.
Persons shall not ride the bail, rim, bonnet, or crosshead of any shaft conveyance except when necessary for inspection and maintenance, and then only when suitable protection for persons is provided.
§ 56.19075 - Use of open hooks.
Open hooks shall not be used to hoist buckets or other conveyances.
§ 56.19076 - Maximum speeds for hoisting persons in buckets.
When persons are hoisted in buckets, speeds shall not exceed 500 feet per minute and shall not exceed 200 feet per minute when within 100 feet of the intended station.
§ 56.19077 - Lowering buckets.
Buckets shall be stopped about 15 feet from the shaft bottom to await a signal from one of the crew on the bottom for further lowering.
§ 56.19078 - Hoisting buckets from the shaft bottom.
All buckets shall be stopped after being raised about 3 feet above the shaft bottom. A bucket shall be stabilized before a hoisting signal is given to continue hoisting the bucket to the crosshead. After a hoisting signal is given, hoisting to the crosshead shall be at a minimum speed. The signaling device shall be attended constantly until a bucket reaches the guides. When persons are hoisted, the signaling devices shall be attended until the crosshead has been engaged.
§ 56.19079 - Blocking mine cars.
Where mine cars are hoisted by cage or skip, means for blocking cars shall be provided at all landings and also on the cage.
§ 56.19080 - Hoisting tools, timbers, and other materials.
When tools, timbers, or other materials are being lowered or raised in a shaft by means of a bucket, skip, or cage, they shall be secured or so placed that they will not strike the sides of the shaft.
§ 56.19081 - Conveyances not in use.
When conveyances controlled by a hoist operator are not in use, they shall be released and the conveyances shall be raised or lowered a suitable distance to prevent persons from boarding or loading the conveyances.
§ 56.19083 - Overtravel backout device.
A manually operated device shall be installed on each electric hoist that will allow the conveyance or counterbalance to be removed from an over-travel position. Such device shall not release the brake, or brakes, holding the overtravelled conveyance or counterbalance until sufficient drive motor torque has been developed to assure movement of the conveyance or counterbalance in the correct direction only.
Signaling
§ 56.19090 - Dual signaling systems.
There shall be at least two effective approved methods of signaling between each of the shaft stations and the hoist room, one of which shall be a telephone or speaking tube.
§ 56.19091 - Signaling instructions to hoist operator.
Hoist operators shall accept hoisting instructions only by the regular signaling system unless it is out of order. In such an event, and during other emergencies, the hoist operator shall accept instructions to direct movement of the conveyances only from authorized persons.
§ 56.19092 - Signaling from conveyances.
A method shall be provided to signal the hoist operator from cages or other conveyances at any point in the shaft.
§ 56.19093 - Standard signal code.
A standard code of hoisting signals shall be adopted and used at each mine. The movement of a shaft conveyance on a “one bell” signal is prohibited.
§ 56.19094 - Posting signal code.
A legible signal code shall be posted prominently in the hoist house within easy view of the hoistman, and at each place where signals are given or received.
§ 56.19095 - Location of signal devices.
Hoisting signal devices shall be positioned within easy reach of persons on the shaft bottom or constantly attended by a person stationed on the lower deck of the sinking platform.
§ 56.19096 - Familiarity with signal code.
Any person responsible for receiving or giving signals for cages, skips, and mantrips when persons or materials are being transported shall be familiar with the posted signaling code.
Shafts
§ 56.19100 - Shaft landing gates.
Shaft landings shall be equipped with substantial safety gates so constructed that materials will not go through or under them; gates shall be closed except when loading or unloading shaft conveyances.
§ 56.19101 - Stopblocks and derail switches.
Positive stopblocks or a derail switch shall be installed on all tracks leading to a shaft collar or landing.
§ 56.19102 - Shaft guides.
A means shall be provided to guide the movement of a shaft conveyance.
§ 56.19103 - Dumping facilities and loading pockets.
Dumping facilities and loading pockets shall be constructed so as to minimize spillage into the shaft.
§ 56.19104 - Clearance at shaft stations.
Suitable clearance at shaft stations shall be provided to allow safe movement of persons, equipment, and materials.
§ 56.19105 - Landings with more than one shaft entrance.
A safe means of passage around open shaft compartments shall be provided on landings with more than one entrance to the shaft.
§ 56.19106 - Shaft sets.
Shaft sets shall be kept in good repair and clean of hazardous material.
§ 56.19107 - Precautions for work in compartment affected by hoisting operation.
Hoistmen shall be informed when persons are working in a compartment affected by that hoisting operation and a “Men Working in Shaft” sign shall be posted at the hoist.
§ 56.19108 - Posting warning signs during shaft work.
When persons are working in a shaft “Men Working in Shaft” signs shall be posted at all devices controlling hoisting operations that may endanger such persons.
§ 56.19109 - Shaft inspection and repair.
Shaft inspection and repair work in vertical shafts shall be performed from substantial platforms equipped with bonnets or equivalent overhead protection.
§ 56.19110 - Overhead protection for shaft deepening work.
A substantial bulkhead or equivalent protection shall be provided above persons at work deepening a shaft.
§ 56.19111 - Shaft-sinking ladders.
Substantial fixed ladders shall be provided from the collar to as near the shaft bottom as practical during shaft-sinking operations, or an escape hoist powered by an emergency power source shall be provided. When persons are on the shaft bottom, a chain ladder, wire rope ladder, or other extension ladders shall be used from the fixed ladder or lower limit of the escape hoist to the shaft bottom.
Inspection and Maintenance
§ 56.19120 - Procedures for inspection, testing, and maintenance.
A systematic procedure of inspection, testing, and maintenance of shafts and hoisting equipment shall be developed and followed. If it is found or suspected that any part is not functioning properly, the hoist shall not be used until the malfunction has been located and repaired or adjustments have been made.
§ 56.19121 - Recordkeeping.
At the time of completion, the person performing inspections, tests, and maintenance of hoisting equipment required in standard 56.19120 shall certify, by signature and date, that they have been done. A record of any part that is not functioning properly shall be made and dated. Certifications and records shall be retained for one year.
§ 56.19122 - Replacement parts.
Parts used to repair hoists shall have properties that will ensure the proper and safe function of the hoist.
§ 56.19129 - Examinations and tests at beginning of shift.
Hoistmen shall examine their hoists and shall test overtravel, deadman controls, position indicators, and braking mechanisms at the beginning of each shift.
§ 56.19130 - Conveyance shaft test.
Before hoisting persons and to assure that the hoisting compartments are clear of obstructions, empty hoist conveyances shall be operated at least one round trip after:
(a) Any hoist or shaft repairs or related equipment repairs that might restrict or obstruct conveyance clearance;
(b) Any oversize or overweight material or equipment trips that might restrict or obstruct conveyance clearance;
(c) Blasting in or near the shaft that might restrict or obstruct conveyance clearance; or
(d) Remaining idle for one shift or longer.
§ 56.19131 - Hoist conveyance connections.
Hoist conveyance connections shall be inspected at least once during any 24-hour period that the conveyance is used for hoisting persons.
§ 56.19132 - Safety catches.
(a) A performance drop test of hoist conveyance safety catches shall be made at the time of installation, or prior to installation, in a mockup of the actual installation. The test shall be certified to in writing by the manufacturer or by a registered professional engineer performing the test.
(b) After installation and before use, and at the beginning of any seven day period during which the conveyance is to be used, the conveyance shall be suitably rested and the hoist rope slackened to test for the unrestricted functioning of the safety catches and their activating mechanisms.
(c) The safety catches shall be inspected by a competent person at the beginning of any 24-hour period that the conveyance is to be used.
§ 56.19133 - Shaft.
Shafts that have not been inspected within the past 7 days shall not be used until an inspection has been conducted by a competent person.
§ 56.19134 - Sheaves.
Sheaves in operating shafts shall be inspected weekly and kept properly lubricated.
§ 56.19135 - Rollers in inclined shafts.
Rollers used in operating inclined shafts shall be lubricated, properly aligned, and kept in good repair.